您的设施需要空中授权,但您不确定如何继续。使得允许流程顺利高效的是可行的,以及确保您的项目符合您的灵活性,货币和时间要求,以便为您的目标进行决定运行您的业务。您可以通过在Project开始的项目中提供所有业务目标标准和项目细节来完成此操作。
排放来源的内容:
What type of source do you have?
第一步是真正了解您计划建设的源类型。过程如何流动?需要哪些设备包括燃烧燃料的任何东西,使用化学品,产生灰尘,并利用燃烧或灰尘收集器等控制装置?了解该项目的基本原理对于确定许多州的授权途径并完成下一步:排放计算至关重要。
What are your projected emissions?
Based on data provided on source type and process flow, calculations should be performed to determine emission levels. The type of information needed will depend on the source, but below is an example list of information needed to perform calculations for various sources:
- 小时的操作的酸ce
- 基于操作和/或制造商信息的时间或单位价值最大和平均材料使用
- Maximum and average operational rate on time or unit value based on operational and/or manufacturer information
- 设备热量输入额定值
- 设备额定功率
- Safety data sheets for materials used
- 如果可用的分析报告或源测试数据
Once the emission levels are determined, they are evaluated against authorization types and the attainment status of the county for which your project resides.
你适应什么授权?
Utilizing your source type evaluation along with your emissions calculations, you can determine which authorization mechanism to use with your permitting authority. This evaluation should be based on both source type and emissions from each source and site as a whole. For smaller operations and sources, start with the exemptions. For example, Texas hasde minimi.susage rates and ade minimi.slist。如果您的网站或源在此列表中,可能是您的授权机制。有没有办法满足最简单的授权机制?
Great! Now you have determined your authorization mechanism. But, you’re not done yet! All the above analyses need to be compiled and documented in some fashion utilizing your regulatory authority’s guidance, forms, and online systems. Even then there are more methods to present this information to authorize your project for construction.
Contact Our Environmental Consultants
如果您对空中允许或排放有任何疑问,请给我们通话或点击下面的链接填写我们的联系我们表格。