Skip to content
Braun Branded Graphic
Projects

I-35W Bridge

Talk to a Consultantarrow icon
Client Flatiron-Mason, a joint venture and FIGG
Braun Branded Graphic

After the I-35W Bridge collapse, an aggressive rebuilding plan was needed to restore essential traffic flow to the Twin Cities. Because contamination was detected on the site and on the banks of the Mississippi River, Braun Intertec designed and inspected erosion control measures and access to the river for Stormwater Pollution Prevention Plan (SWPPP) purposes. To prevent contaminated soils from entering the river, we monitored drilling operations around the clock. Throughout the project, we oversaw the profiling, disposal and treatment of approximately 65,000 cubic yards of contaminated soil and more than 3 million gallons of groundwater.

Project engineers worked up to 80 hours a week to complete a foundation design prior to construction. Challenges included artesian water pressures in the St. Peter sandstone. To maintain the schedule, we coordinated up to four drill rigs working seven days a week, and during the first months of the project, we had environmental and geotechnical field staff on site 24 hours a day working in sub-zero temperatures. Since the I-35W Bridge project, the client has invited us to work with them on future bridge and infrastructure projects throughout the U.S.

Contact Us

    This website requires cookies to provide all of its features. For more information on what data is contained in the cookies, please see ourPrivacy Policypage. By continuing to use this website, you agree to our Privacy Policy.